Product Information
Product code: 21-6020000600H6100 Categories: Attachments, Auger Drive Head.£48,145.66
Auger Torque is proud to announce the release of our brand new XHT Series Torque Heads. Specifically designed and ideally suited to foundation screw pile applications this series heralds a new era in the world of screw pile torque heads.
The new torque heads are available to suit machines from as little as 24T all the way to 50T and are designed and manufactured in-house at Auger Torque’s UK facility, guaranteeing class leading workmanship and the reliability Auger Torque is famous for.
Of course Auger Torque’s range of Alignment and Torque Monitoring devices are compatible with the XHT torque heads, giving you a state of the art combination when it comes to installing foundation screw piles.
Integral oil conditioning & Auger Torque’s Non Dislodgement Shaft (NDS™) are unique features that will prolong the service life of your attachment, increase workplace safety and put our torque heads a cut above the rest.
Standard with the XHT150 & XHT250 and unique to Auger Torque, the Non-Dislodgement Shaft is a single piece drive shaft assembled top down and locked into the Earth Drill housing. This design guarantees that the shaft will never fall out, making for a safer work environment, not only for the operator but also any surrounding workers. This is a MUST-HAVE FEATURE for any safety conscious company.
High quality hydraulic motors, output shaft bearings which are 50% larger than our nearest competitors comparable drive and the use of only high grade materials mean that your Earth Drill will have a long, reliable service life.
Standard with all Earth Drills in areas that we know will take a lot of strain. All hood pins are locked for extra safety making it impossible for the hood to detach from your hitch.
Torque is amplified by using the unique Auger Torque planetary gearbox. This system allows the motors output torque to be multiplied with extreme efficiency as well as ensuring the durability and reliability you need.
Unique to Auger Torque, the Non-Dislodgement Shaft is a single piece drive shaft assembled top down and locked into the Earth Drill housing. This design guarantees that the shaft will never fall out, making for a safer work environment, not only for the operator but also any surrounding workers, a MUST-HAVE FEATURE for any safety conscious company.
Auger Torque’s huge buying power means we work closely with high quality suppliers to develop the most reliable attachments available on the market today.
Please note hoses and adaptors and QRC are not included with this Earth Drill but are available to purchase separately.
In stock
Description
Torque Range: 144,662-249,140 Nm
Oil Pressure Range: 180-310 Bar
Oil Flow Range: 80-225 lpm
Speed Range: 1.8-4 rpm
Unit Height: 2166mm
Unit Diameter: 825mm
Unit Weight: 2400 kg
Hitch Options: Single Pin Hitch
Double Pin Hitch
Double Pin Cradle Hitch
Output Shaft: 180mm Hex
Be the first to review “AUGERTORQUE XHT 225 SCREW PILE TORQUE HEAD C/W TRANSIT CRADLE” Cancel reply
Related Products
ARROWHEAD R55 BREAKER C/W TOP BRACKET,HOSES & 1 X STEEL PRICE PLUS VAT
- Tie-rod less hammer design
- Narrow round box provides superior access to surfaces in confined spaces such as trenching work
- Vibration and sound supressed at standard
- The hammer can be fully serviced using no specialist tools
- Powerful gas fired operation using less oil at lower working pressures
- Excavator friendly
ARROWHEAD R55 POST DRIVER C/W TOP BRACKET,HOSES & 1 X STEEL
ARROWHEAD R90 BREAKER C/W TOP BRACKET,HOSES & 1 X STEEL
- Tie-rod less hammer design
- Narrow round box provides superior access to surfaces in confined spaces such as trenching work
- Vibration and sound supressed at standard
- The hammer can be fully serviced using no specialist tools
- Powerful gas fired operation using less oil at lower working pressures
- Excavator friendly
ARROWHEAD ACP200 COMPACTION PLATE C/W TOP BRACKET & HOSES
- Backfill trench compaction
- Sheet, post and pile driving
- Soil compaction
ARROWHEAD R45 BREAKER C/W TOP BRACKET,HOSES & 1 X STEEL PRICE PLUS VAT
- Tie-rod less hammer design
- Narrow round box provides superior access to surfaces in confined spaces such as trenching work
- Vibration and sound supressed at standard
- The hammer can be fully serviced using no specialist tools
- Powerful gas fired operation using less oil at lower working pressures
- Excavator friendly
ARROWHEAD R40 POST DRIVER C/W TOP BRACKET,HOSES & 1 X STEEL
ARROWHEAD R70S SKID STEER BREAKER C/W TOP BRACKET,HOSES & 1 X STEEL
AUGERTORQUE 51-8925 1M HEDGE TRIMMER EXTENSION BAR FOR T150
ARROWHEAD R45S SKID STEER BREAKER C/W TOP BRACKET,HOSES & 1 X STEEL
ARROWHEAD ACP350 COMPACTION PLATE C/W TOP BRACKET & HOSES
- Backfill trench compaction
- Sheet, post and pile driving
- Soil compaction
Reviews
There are no reviews yet.